The BRT Line 7 Feasibility Study was commissioned by DTCA in May 2019. The aim was to investigate the feasibility of a BRT-7 line from Narayanganj to Kapasia through Dhaka’s fast-growing Eastern Fringe. The corridor was originally proposed in the 2015 Revised Strategic Transport Plan (RSTP) and the 2016 Dhaka Structure Plan (DSP)